Business outline  
Our business aims to supply 1,000,000 green homes by 2020, and install facilities to utilize green energies including solar energy, solar heat, geothermal heat, small-scale wind power etc in homes free of charge.
 
Summary of business supplying 1,000,000 green homes  
 
Area Classification Support scale(/unit) Support rate Remark
Solar energy Fixed Less than 3kW / unit MAX less than 60% Meets system link standards
BIPV
Tracing
 
Requirements for installation  
 
Classification Requirements
Detached house According to the Building Registry, buildings defined as “detached houses” in Article 3, Item 4, Table 1 of the Building Code Enforcement Ordinance, and installed with new recyclable energy equipment
Town house 1. Existing town house
Limited to businesses that have submitted a plan for installment (including plans for installation cost coverage), that have been selected for funding, and that have secured the agreement of home residents
The contracting party must represent the residents

2. under construction town house
Limited to businesses that have submitted a plan for installment (including plans for installation cost coverage), that have been selected for funding, and construction completed within the year
the contracting party must represent the construction company and residents of the public housing

* If those stipulated as owner according to the registries for detached housing have communal ownership, the application must be made in the name of the owner of the largest share, and that party will be considered the owner of the equipment installed
* Limited to cases where the contract classification with the Korean electric power corporation is “resident home” at the time of installment of power equipment (solar, wind)
* No funding provided to building owned by the government or regional self-sufficiency groups
 
Procedure for application  
 
1. Select a professional enterprise : Select a professional enterprise after reviewing performances, number of experts, A/S system etc (www.energy.co.kr)
2. Select a professional enterprise after reviewing their performance records, number of experts, A/S system etc then install (www.energy.co.kr)
3. Application : Apply to a professional enterprise completing all necessary paperwork
4. Review conditions for installation : Sign a contract with a professional enterprise after reviewing conditions for installation with consumers
5. Construction : Issue warranty(3 years) after completing main solar energy development system.
6. Review installation : Inspection is to be conducted by Korea electric power cooperationthen get final inspection by Korea energy management cooperation.